Square Deal B Disassembly

Sep 26th, 2016
  • Detach the loaded cartridge chute from the right side of the frame.
  • Detach the primer feed system from the front of the frame.
  • Remove one link arm only at this time.  It doesn’t matter which side.
  • Detach the powder measure to prevent damage to it.
  • Unbolt the machine from your bench or strongmount.
  • Pull the handle down on the machine.
  • On the back of the frame, below the mounting flange, is a steel bolt.  Remove it.
  • Remove the other link arm.  Now the shaft can slide out of the frame.
  • Re-tighten the index lever pivot bolt.
  • Reassemble in the reverse.  Before you reinstall the cam bolt in the back of the frame, you must reattach at least one link arm and pull the handle down.  Only if the handle is down can this screw be reinstalled.

We have several helpful videos on our site.  Just scroll down until you find the one you need.

Follow us on Facebook.
Thank you for your feedback!

Send Us Your Feedback

  • Required fields are indicated by an asterisk (*)

Related Articles

Phone Support
Phone Support
Toll Free 800-762-3845
Local 480-948-8009
Email Us
Email Us
Have questions?
Send us a message!
Ask Community
Ask Community
Our forum is a great place to get help from our community of users and customers.